Contact Us

Project Participants:

Ruby
Truckee Donner Public Utility District
Phone: 530-582-3963
www.tdpud.org

TDPUD Biomass Project


Foundation of Biomass project in 2005

The project will provide electricity for the TDRPD Regional Park facilities and will utilize the biomass heat waster by-product for heating the main park office building.  The 15 Kw Biomax Biomass plant is funded by the CEC and becomes the property of the TDRPD in exchange for TDRPD maintaining and operating the system and providing data about its operation. 

The biomass plant will require about 50 lbs of biomass material per hour, which would be supplied by the Forest Service, Park Service, TDPUD, Fire Protection District, and private landowners- all of which have a need to dispose of such waste. Calculations indicate that the plant will produce about 50,000 BTU’s of heat per hour, which is enough to heat an average 1,800 square-foot home in Truckee.  An eight-hour per day biomass plant operation will produce about $4000 in retail electricity value annually. 

Photo by Joel Erickson

Project:  Small Scale Biomass Project

Owner:  Truckee Donner Public Utility District & Truckee Donner Recreation and Park District

Size: 15 Kw

Date of Construction: 2005

Tags: New Construction

Mail can be sent to: SiGBA P.O. Box 4245 Truckee, CA 96160

© Copyright 2017 Sierra Green Building Association